APAPES TIMETABLE
(update Jan 2014)
Table I: Projected
new delay-adjusted summary of timetable from 1/10/2011 to 31/12/2015 stretching
over the 48 month proposal period.
The more than 10 months delay in the transfer of funds to the APAPES
project account at ELKE (UoC) resulted in the overall project delays shown
below. Work packages (WP) are listed.
Shaded
Area Symbol Indications:
Limited activity |
|
Use of Machine Shop |
|
Tests with ion beams from accelerator |
|
Electron spectroscopy with ion beams |
|
Title |
Activities |
Deliverables |
|
Start |
End |
|||||||||||||||||
2011 |
2012 |
2013 |
2014 |
2015 |
06/10/2011 |
31/12/2015 |
||||||||||||||||
d |
a |
b |
c |
d |
a |
b |
c |
d |
a |
b |
c |
d |
a |
b |
c |
d |
|
|
||||
Á. Design, Construction and
Testing |
|
01/01/12 - 30/06/14 |
||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
01/10/11 |
30/06/14 |
||||
WP2 - Two ion beam strippers: Design, construction, testing and use |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
01/10/11 |
30/06/14 |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
01/10/11 |
30/09/14 |
||||
WP4 - Collision
chamber: Connection
to beam line and vacuum apparatus |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
01/12/12 |
28/02/14 |
|||
WP5 - Differentially
pumped gas cell:
Implementation and testing |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
01/06/13 |
30/06/14 |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
01/12/13 |
30/6/14 |
||||
WP7 - Electron
spectrometers: Preparation, setup and operation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1/07/13 |
30/6/14 |
|||
Â. Measurements |
|
1/07/14 - 31/12/15 |
||||||||||||||||||||
WP8 - Measurements of
electron spectra using ions from the TANDEM accelerator |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1/07/14 |
31/12/15 |
|||
C. Results and Dissemination |
|
1/07/14 - 31/12/15 |
||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1/07/14 |
31/12/15 |
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1/07/14 |
31/12/15 |
||||
D. APAPES Management |
|
1/10/11 - 31/12/15 |
||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1/10/11 |
31/12/15 |
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1/10/15 |
31/10/15 |
||||
PREVIOUS
APAPES TIMETABLES OF WORK PACKAGES