Home > Work Packages > WP3 - 00 Auger projectile spectroscopy - Design of experimental apparatus
Work Packages

Work Packages: WP1  WP2  WP3  WP4  WP5  WP6  WP7  WP8  WP9  WP10  WP11  WP12 Timetable

Work Package 3: 00 Auger projectile spectroscopy - Design of experimental apparatus

Figure 1: Photo of spectrometer chamber on XYZ translation table and gas cell 6-way cross with turbos installed.

Figure 2: 3-D schematic of new chamber support structure (SolidWorks 3D)

 

Figure 3: Double differentially pumped target gas cell, along with paracentric HDA with 4-element injection lens and 2-D PSD. Each color denotes a different electrode voltage. The length of the gas cell (in red) is 50mm and its distance (center) to the lens entry 286mm. (SolidWorks 3D)

 

Description of work package

Work Package

3

Start:

Month 1

Finish:

Month 9

Cost:

Title:

WP3: 00 Auger projectile spectroscopy - Design of experimental apparatus

Description:

Research Teams:

RT1, RT2, RT3

3.1 Design of full experimental setup inside collision chamber: Details of electron optics, gas cell and spectrometer input lens geometries will be reconsidered and partially redesigned to further improve Kansas apparatus. TRANSPORT code used to optimize ion beam transmission through the target gas cell.

3.2 Market research, ordering and receiving all required components: The apparatus from Kansas came without electronics such as signal processing amps, HV power supplies and data acquisition which have to be bought. New spectrometer support will be designed and constructed in the machine shop.  

Deliverables:

2 Reports and part of BS, MS or PhD thesis

WP3: Table of Activities during THALIS funding period (end 31/12/2015)

CompletedActivityTarget Date
Parametric design on 5-element lens tested both experimentally and in SIMION simulation in collaboration with Afyon Kocatepe University e-2e group (AKU), Afyon, Turkey
Jul 2011
Poster presented at XFEL Users meeting Jan 24-25 2012, DESY Hamburg
Jan 2012
Abstract of first results submitted to ICPEAC 2013
Mar 2013
First results published in Rev. of Scientific Instruments RSI 84 (2013) 043105
Apr 2013
Talk presentation at 22nd Hellenic Nuclear Physics Symposium
May 2013
Poster Presentation at ICPEAC 2013 in Lanzhou, China
Jul 2013
Build support for spectrometer chamber in machine shop
Aug 2013
SIMION study of optimal lens voltages
Mar-Apr 2014
Prepare tender for HV power supplies amd voltage control unit
Apr 2014
Install HV power supplies
Jul 2014
Install control unit for HV power supplies still needs programming work to be undertaken by Fasmatek
Jul 2014
Installation of signal processing and data acquisition system (successfully tested on May 12, 2014)
May 2014
Integrate voltage control with data acquisition system to be completed by Fasmatech
Sep 2014
Integrate beam current counterl with data acquisition system to be completed by Fasmatek
Sep 2014
Counter for BCI control implemented with working Labview software
Nov 2014
Changes to Fasmatek vi for improved accuracy in the setting of the HV power supplies implemented
Nov 2014
partly completed Diploma thesis by Mr. Giannis Gennarakis
Dec 2015
Final Report on work package completed
Dec 2015

WP3: Deliverables

  • TR1 - Zero degree Auger projectile spectroscopy: Design of experimental apparatus
  • TR2 - Zero degree Auger projectile spectroscopy:Vacuum, controls and DAQ
  • part of Mr. G. Gennarakis Bachelor thesis
  • part of Mr. A. Laoutaris Masters thesis
  • part of Mr. I. Madesis PhD thesis
  • Additional related results:

  • Poster presented at ICPEAC 2013, July 24-30, 2013, Lanzhou, China
  • Talk presentation at 22nd Hellenic Nuclear Physics Symposium    Talk
  • Publication in RSI 84 (2013) 043105
  • Poster presented at XFEL Users meeting Jan 24-25 2012, DESY Hamburg
  • WP3: People involved

    • Prof. Theo Zouros - MRG RT1 (UoC)
    • Giannis Madesis (PhD student) - GEC RT1 (UoC)
    • Giannis G. Gennarakis - GEC RT1 (UoC)
    • Dr. Tasos Lagoyannis - MRG RT2 (INP Demokritos)
    • Dr. Michalis Axiotis - GEC RT2 (INP Demokritos)
    • Tasos Kanellakopoulos (student technical assistance) - GEC RT2
    • Spyros Doukas (student technical assistance) - GEC RT3
    • Nikos Angelinos (student technical assistance) - GEC RT1
    • Tasos Dimitriou (Postdoc) - GEC RT1
    • Andreas Bozatzidis - Fasmatech
    • Aggelos Laoutaris (MS student) - GEC RT1 (UoC)

    WP3: References


    Work Package 3 ( continued): after end of THALIS grant (31/12/2015)

     

    Figure 4: Pump down times for HDA chamber.

    WP3: Table of Activities in progress

    CompletedActivityTarget Date
    Study, design and implementation of big chamber in front of HDA chamber
    Nov 2016
    Actual Positioning of big chamber in front of HDA chamber
    Spring 2017

    Last Update: 23/09/16 13:38:34